Punjab Tubewell Load Scheme Extended Till December 29: Charges Cut to Rs 2,500 per BHP
Punjab tubewell load scheme has been extended by 45 days, giving farmers until December 29 to regularise excess load on their agricultural tubewell connections at sharply lower charges. The Tribune reported on Saturday that the state government has also cut the service connection charge from Rs 6,572 to Rs 2,500 per BHP and halved the security deposit, a move that comes with Punjab heading to the polls in 2027.
Punjab Tubewell Load Scheme: Key Highlights
| Particulars | Details |
|---|---|
| Scheme | Voluntary Disclosure Scheme (VDS) to regularise excess tubewell load |
| Extension | 45 more days, now valid till December 29, 2026 |
| Original window | October 1 to November 14, 2026 |
| Service connection charge | Cut from Rs 6,572 to Rs 2,500 per BHP |
| Security deposit | Cut from Rs 400 to Rs 200 per BHP |
| Penalty and load surcharge | None on voluntarily declared or inspection-detected excess load |
| Power Minister | Tarunpreet Singh Sond |
| Implementing agency | Punjab State Power Corporation Limited (PSPCL) |

What Is the Punjab Tubewell Load Scheme?
Many farmers in Punjab run motors that draw more power than the load sanctioned on their connection. When PSPCL finds such excess load during an inspection, the connection can attract penalties and surcharges. The Punjab tubewell load scheme is a one-time chance to bring the sanctioned load in line with the real motor capacity, so the connection is legal and the farmer is protected from action.
Under the scheme, a farmer declares the extra load voluntarily and pays only the fixed charges. Even where excess load is detected during PSPCL’s own inspection, the government has said no penalty and no load surcharge will be levied if the connection is regularised within the window.
What Has Changed in the Punjab Tubewell Load Scheme?
Two things changed this week. First, the deadline moved. The original window ran from October 1 to November 14, and it has now been pushed by 45 days to December 29. Second, the cost came down: the service connection charge per BHP (brake horsepower) falls from Rs 6,572 to Rs 2,500, and the security deposit per BHP falls from Rs 400 to Rs 200.
The decision was announced by the power department under Power Minister Tarunpreet Singh Sond. It came a day after the state waived penalty and interest on domestic power bills for about 25 lakh consumers, which we explain in our report on the Punjab OTS scheme.
How Much Will Farmers Save Under the Punjab Tubewell Load Scheme?
The saving depends on how much load a farmer is regularising. Here is a simple illustration using the official per-BHP rates, with an assumed 5 BHP of extra load:
- Old service connection charge: 5 x Rs 6,572 = Rs 32,860
- New service connection charge: 5 x Rs 2,500 = Rs 12,500
- Old security deposit: 5 x Rs 400 = Rs 2,000
- New security deposit: 5 x Rs 200 = Rs 1,000
In this example the total cost drops from Rs 34,860 to Rs 13,500, a saving of Rs 21,360. These figures are an illustration for explanation only. Your actual bill will be calculated by PSPCL, so always ask for the written calculation before paying.

How to Use the Punjab Tubewell Load Scheme: Step by Step
- Check your motor and sanctioned load. Compare the horsepower of your motor with the load written on your connection.
- Visit your PSPCL sub-division office. Ask for the VDS form for tubewell load regularisation, or check the PSPCL website for notices.
- Declare the excess load. Voluntary declaration is the safest route, since no penalty applies.
- Pay the reduced charges. Pay only the amount PSPCL calculates at the new rates and collect the receipt.
- Get the load revised. Confirm that the sanctioned load on your connection record has been updated.
- Do it before December 29. Do not wait for the last week, as offices can get crowded.
Why the Punjab Tubewell Load Scheme Matters Before 2027
Agriculture is the backbone of Punjab’s economy, and tubewells are the main source of irrigation for paddy and wheat. Free farm power already costs the state a large subsidy, and unauthorised extra load puts stress on transformers and lines, causing trips and burnt transformers during peak paddy season. Regularising the load helps PSPCL plan its network better, while farmers avoid fear of inspection.
Politically, the timing is hard to miss. With the 2027 Assembly elections approaching, the government has been rolling out one relief after another. A day after this decision, it launched a youth quiz portal, which we cover in our post on Punjab Da Crorepati. Opposition parties have questioned the motive behind such announcements, while the government says they are aimed at ordinary people.
Tips for Farmers Using the Punjab Tubewell Load Scheme
- Keep a copy of your previous electricity bill, land record and identity proof ready.
- Ask for every payment to be recorded with a printed receipt.
- Do not pay agents or middlemen. The charges are fixed per BHP.
- If your connection has a dispute, raise it at the sub-division office in writing.
- Follow updates from the Punjab Government and PSPCL for any change in dates.

Punjab Tubewell Load Scheme: Frequently Asked Questions
What is the last date for the Punjab tubewell load scheme? The scheme has been extended by 45 days and is now valid till December 29, 2026.
What are the new charges under the Punjab tubewell load scheme? The service connection charge is Rs 2,500 per BHP, down from Rs 6,572, and the security deposit is Rs 200 per BHP, down from Rs 400.
Is there any penalty under the Punjab tubewell load scheme? No penalty or load surcharge applies on excess load that is declared voluntarily or detected during inspection, as per the reported decision.
Who runs the Punjab tubewell load scheme? PSPCL implements it through its sub-division offices, under the state power department.
This article is based on news reports available on November 15, 2026. Rates, dates and conditions are set by PSPCL and the Punjab government and may change, so confirm with your local PSPCL office before paying.

Pingback: Punjab OTS Scheme: Rs 518 Cr Power Bill Penalty Waived